Energy & Industrial Marine
Intake / Discharge Water Lines — 1,500 m
Tema Power Generation – Arab Contractors · Tema, Ghana
- Client
- Tema Power Generation – Arab Contractors
- Location
- Tema, Ghana
- Our role
- Analysis · Design
- Period
- 2014 – 2016
- Project value
- 18M USD
- Sector
- Energy & Industrial Marine
Project overview · Energy
Scope & key figures
Intake / Discharge Water Lines — 1,500 m is a energy & industrial marine project in Tema, Ghana, delivered for Tema Power Generation – Arab Contractors. Geotechnics provided analysis, design. Key figures: 1,500 m of marine intake & discharge lines.
- 1,500 m of marine intake & discharge lines

5.630°, -0.010°
More energy projects
All energy & industrial marine Related work

EnergyOngoing
Ain Sukhna, Egypt
Ain Sukhna Product Hub
Arab Petroleum Pipelines Co. (SUMED)
Project value918M EGP2012 – Ongoing

EnergyOngoing
Matrouh, Egypt
El-Dabaa Marine Service Port
Nuclear Power Plants Authority (NPPA)
680 m quay lengthProject value500M EGP2019 – Ongoing

EnergyOngoing
Ain Sukhna, Egypt
Sukhna Port 3rd Basin — Liquid Bulk Terminal
Petroleum Marine Services (PMS)
Project value130M EGP2015 – Ongoing