Ports & TerminalsOngoing
Four Berthing Dolphins (50,000 t vessels)
Oriental Ports Construction (OPC) · Ain Sukhna, Egypt
- Client
- Oriental Ports Construction (OPC)
- Location
- Ain Sukhna, Egypt
- Our role
- Design · Supervision
- Period
- 2016 – Ongoing
- Project value
- 50M EGP (8.3M USD)
- Sector
- Ports & Terminals
Project overview · Ports
Scope & key figures
Four Berthing Dolphins (50,000 t vessels) is a ports & terminals project in Ain Sukhna, Egypt, delivered for Oriental Ports Construction (OPC). Geotechnics provided design, supervision — work is ongoing. Key figures: Design vessel capacity: 50,000 t.
- Design vessel capacity: 50,000 t
29.680°, 32.370°Open in Google Maps
More ports projects
All ports & terminals Related work

PortsOngoing
Abu Qir, Alexandria, Egypt
Abu Qir Marine Port
Egyptian Navy
6,850 m of quay wallsProject value45.4B EGP2021 – Present

PortsOngoing
Suez Canal, Egypt
East Branch Port Expansion (2025)
Suez Canal Authority
6,050 m of quay wallsProject value8B EGP2025 – Ongoing

PortsOngoing
Suez Canal, Egypt
East Branch Port Expansion (2015)
Suez Canal Authority
4,500 m of quay wallsProject value5B EGP2015 – Ongoing