Four Berthing Dolphins (50,000 t vessels), Ain Sukhna
Ports & TerminalsOngoing

Four Berthing Dolphins (50,000 t vessels)

Oriental Ports Construction (OPC) · Ain Sukhna, Egypt

Client
Oriental Ports Construction (OPC)
Location
Ain Sukhna, Egypt
Our role
Design · Supervision
Period
2016 – Ongoing
Project value
50M EGP (8.3M USD)
Sector
Ports & Terminals
Project overview · Ports

Scope & key figures

Four Berthing Dolphins (50,000 t vessels) is a ports & terminals project in Ain Sukhna, Egypt, delivered for Oriental Ports Construction (OPC). Geotechnics provided design, supervision — work is ongoing. Key figures: Design vessel capacity: 50,000 t.

  • Design vessel capacity: 50,000 t

29.680°, 32.370°Open in Google Maps